Site logoSite logo
0

Installation

A beautiful floor. Laid properly.

Professional cork flooring installation and practical guidance for Montado floors, from subfloor checks to the final finish.

The standard

The floor is only as good as what sits beneath it.

Cork is forgiving underfoot, but it is not forgiving of poor preparation. Subfloor moisture, flatness, acclimatisation, expansion gaps and the right adhesive or barrier all matter. Montado keeps installation guidance specific to the product being fitted.

Experience

30 yearsYears

Practical flooring experience across residential and commercial projects.

Workmanship

5 yearguarantee

Montado approved installations are backed by a five year workmanship guarantee where agreed in writing.

Underfloor heating

By rangecompatible

Underfloor heating compatibility depends on the product and installation method. Follow the relevant Granorte guide and surface temperature limit.

Cork flooring installation experience

Preparation

Preparation is the quiet part of the job.

The best floors usually fail or succeed before the first plank is laid. Moisture readings, flatness, acclimatisation, adhesive choice and expansion gaps are not extras. They are the work.

Montado can advise from photographs and measurements first, then confirm what is needed before installation begins.

The details that don't show are usually the ones that matter most.

Professional cork flooring installers at work

The right method

The right method for the right product.

Naturals and Designtrend floating floors use a click system. Naturals Fix is glued directly to the subfloor. Walltrend is glued to the wall. Each product needs its own guide, not a generic cork installation note.

Follow the Granorte guide for the specific range, including moisture testing, the correct barrier or adhesive, acclimatisation and expansion gaps. If the technical data sheet and installation guide give different limits, use the lower limit until Granorte confirms otherwise.

Where we work

Covering the south of England

  • Hampshire
  • Wiltshire
  • Dorset
  • Surrey
  • London
Montado cork flooring installation

The person overseeing it

Thirty years in flooring. Overseen from start to finish.

Montado oversees every installation personally, drawing on around 30 years in flooring. We do not fit the floors ourselves. We make sure the right range is chosen, the preparation is right, and the standard holds from quote to completion.

Direct access. The person who answers knows the product, the trade, and your project.

Montado

Where we install

Residential and commercial

Living rooms to whole homes.
Residential

Living rooms to whole homes.

Living rooms, bedrooms, kitchens, dining spaces, home offices and whole home renovations. The same standard of preparation and finish regardless of room size.

Discuss Your Project
Boutique to large scale.
Commercial

Boutique to large scale.

Boutique hotels, wellness and yoga studios, offices, restaurants, retail environments and architect or interior designer specified projects.

Discuss Your Project

What we offer

  • Guide quote
    From photographs and approximate measurements, so you have a clear sense of cost before committing to anything.
  • Site visit
    Where required, to assess the subfloor, confirm measurements and plan the project properly before work begins.
  • Subfloor preparation
    Careful preparation as standard. The foundations of a good floor are largely invisible. We do not skip them.
  • Five year guarantee
    Covering the quality of workmanship carried out by Natrul approved installers.

The right floor deserves the same care as every other decision in the project.

Montado

Before installation day

What the room needs to be ready.

  • Acclimatisation Cork needs a minimum of 2 days in the room before fitting, at 18 to 26°C and 35 to 65% relative humidity.
  • Subfloor moisture Below 2.0% CM (1.5% with underfloor heating). New concrete needs a minimum of 60 days to dry before flooring goes down.
  • Expansion gap A 10 to 15mm gap is left at the perimeter of every floating floor to allow for natural movement.
  • Underfloor heating Run for 3 to 4 days before installation at around 18°C, then returned to normal operation gradually, no earlier than 3 days after fitting.

Prefer to fit it yourself?

Full installation guides, technical data sheets and care instructions are available to download. View Installation Guides

Common questions

Before you get in touch

The right floor deserves the right installation.

Send the project brief. The right floor gets recommended, samples follow and installation is discussed from there.

Send Us the Brief